General Description
MAIN BOOM: 197'
LUFFING JIB: 259'
FULL COUNTERWEIGHT
UPPER HOURS: 10,144
LOWER HOURS: 7,076
MILEAGE: 54,000
MILES ENGINE: TIER4i SUPERLIFT AND LUFFER TRIDEM BOOM DOLLY PLEASE CALL OR EMAIL FOR MORE INFORMATION
BASIC STANDARD UNIT: 12 x 8 x 12 LHD
Mercedes Benz power (Tier 4 interim) Mega-Wing-Lift system including testing, calibration of LMI and loadcharts.
25.0 - 79.0m luffing jib and 12.0 - 70.0m fixed / offsettable jib (3°, 25°) Spreader for MWL to use with either 25.0-79.0m luffing jib or 12.0-64.0m fixed/offsettable jib (3°, 25°) 2 worklights, mounted on top of boom base section (controlled from superstructure cab)
Boom head mounted aircraft warning light (registered).
Auxiliary boom nose
Trailing boom float kit.
Boom removal kit.
Auxiliary hoist, axial piston motor with planetary gear and automatic multiple disc brake.
Drum rotation indicator, additional boom nose idler sheave, 300 m (TBD) of 22mm wire rope. I
ncluding second upper head sheave on boom.
Hoist camera and working light
Additional oil cooler for hydraulic system superstructure.
Rigging winch for luffing Jib or fixed / offsettable jib.
7 sheave hookblock with double hook and dead end [200 tonnes hookblock capacity] 3 sheave hookblock with single hook and dead end. [100 tonnes hookblock capacity]
Single line headache ball [16 tonnes headache ball capacity].
Twelve 20.5R25 (525/80 R25) on / off highway radial tyres in lieu of standard.
Outrigger length control Hydraulic disconnect for all outrigger beams.
Additional oil cooler for hydraulic system carrier
Engine independent diesel cab heater (water) with 24h timer
External starting outlet (carrier and superstructure)
Removable rear outrigger box installation Homologation kit US/FR - to comply with national regulation and registration codes.
Steel outrigger Pads